FOUNDATION – it’s best to prepare it like for a sidewalk – concrete blocks are sufficient.

Please prepare the foundation as soon as possible – weather conditions may later make it impossible to complete, while the house will already be waiting for delivery.

Below are several ways to prepare the foundation (can be done on your own or commissioned to a construction/paving/fence installation company):

Method 1:

Excavate the area, pour a 20 cm layer of compacted sand, then add 10–15 cm of compacted base layer (gravel or dry concrete). After that, place and level the concrete blocks.

Method 2:

Dig a hole under each block measuring 50x50x50 cm. Pour in 20 cm of sand, then 25–30 cm of concrete. Place and level the blocks.

Method 3:

Use cardboard tubes / formwork pipes with a diameter of 35 cm and a length of 50–60 cm. Bury the tubes so that they protrude 7–10 cm above ground level. Fill each tube with concrete.
Make sure the tubes are precisely leveled before pouring concrete.

Method 4:

Use a lightly reinforced foundation slab, 15 cm thick. We will provide a detailed drawing for preparing the slab, including where to leave space for utilities.
Important: the slab must be at least 10 cm smaller than the footprint of the house on each side.

Foundation Blocks:

Use concrete foundation blocks (e.g., 38x24x12/14 cm) or formwork tubes Ø30 cm – total: 30 pcs.

·        Blocks must protrude at least 5 cm above ground level to allow straps to be pulled from under the floor.

·        They must be precisely leveled, with a maximum deviation of 0.5 cm across the entire surface.

·        The outer dimensions of the blocks must be 10 cm smaller than the container on each side.

Utility Connections:

Water / Sewage / Electricity connections must be made after the containers are placed – especially, do not dig along the truck's driving path.

·        Water pipe opening in the floor is located 17 cm from the container's outer wall.

·        Sewage pipe opening is directly under the toilet bowl, 25 cm from the outer wall. A 110 mm pipe (with a coupling) should be inserted from underneath.

·        Electricity – simply connect to the junction box mounted on the outside of each container, at a height of approximately 2.2 m.

·        Grounding – connect grounding tape (bednarka) to any metal part (foundation, flashing, etc. on the outside of the cabin).

There are no reviews for this product yet.

Write Review

The owner of the online store does not guarantee that the published opinions come from consumers who have used or purchased a given product.

Manufacturer Contact Details
MSI Invest
Contact Details of the Responsible Person in the EU
We care about your privacy

Cookies and related technologies allow the website to function properly and help tailor the offer to your needs. We may use our own cookies and our partners' cookies for analytical and marketing purposes, also to adjust advertising content to your preferences. You can choose to accept the use of all these files or adapt the use of files to your preferences.

We care about your privacy

Cookies and related technologies allow the website to function properly and help tailor the offer to your needs. We may use our own cookies and our partners' cookies for analytical and marketing purposes, also to adjust advertising content to your preferences. You can choose to accept the use of all these files or adapt the use of files to your preferences.

Manage cookies

Strictly Necessary Cookies
These files are necessary for the operation of our website, so you cannot disable them.
Analytical cookies
Thanks to these files, we are able to analyze our e-commerce website, which helps to improve it and better adapt it to customer requirements.
Functional cookies
These cookies enable additional site features that go beyond the basic functionality, allowing you to take full advantage of all the site's capabilities.
Advertising cookies
These files are crucial to running our marketing campaigns.
Powered by eBiznes.pl